Home Concrete Cutting Trenching For Plumbing And Utilities

Slab Trenching in Phoenix, AZ

Saw Cut, Dug Out and Hauled, Open on the Day Your Plumber Arrives

We cut, dig and clear trenches through slabs, ready when your plumber shows up. Kogan LLC is a licensed concrete cutting and demolition company in Phoenix (AZ ROC CR-57) that saw cuts concrete floors, digs under-slab trenches for sewer, drain, water and electrical lines, and hauls the spoil and broken concrete away. Laying the pipe, pressure tests and inspections belong to your licensed plumber or electrician, and the new concrete patch is a separate pour. The run is walked at no charge, and you get the number on paper before work starts.

★★★★★  4.9 on Google

Construction safety certification

#335869 · Wrecking

#346029 · Carpentry and remodeling

Inside a slab trenching job

What Slab Trenching Covers, Cut to Backfill

Trench runs cut through a commercial slab, with a compact excavator digging and broken concrete piled for haul-off. The pins follow the list below.

1
2
4
3

Saw-cut trench runs through a commercial building slab

1

To Your DrawingDepth and width marked out and confirmed first, then sawn along both edges.

2

Cut, Dug and ClearedOpen and ready to run pipe, dug to the grade on your plan.

3

Inside or OutsideInterior slabs with containment, or exterior runs with the ground restored.

4

Broken concreteThe strip between the cuts broken up and lifted out.

5

Debris Hauled AwayNo second visit needed; the truck leaves loaded with the spoil and slab.

6

Backfill after inspectionTrench refilled once your pipe is in and signed off.

Not part of the job

Work that stays with your trades

We open the trench and close it again. What goes in it belongs to licensed trades.

Laying and testing pipe

Sewer, drain and water lines are set, joined and tested by your licensed plumber.

Conduit and wiring

New electrical runs under the slab are installed by a licensed electrician.

Pouring the patch

Placing new concrete over the backfilled trench is its own pour.

We cut the line, dig it out and haul the debris away, to the depth and width on your drawing. Trenching sits within our concrete cutting services, beside slab sawing and concrete flatwork.

Smaller trenching jobs

Only a Short Run to Open?

Not every repair needs a long trench. We open just the run your plumber needs and leave the rest of the floor alone.

Single drain repair

A short trench over one broken drain or sewer section.

Conduit run

A narrow trench for new power to an island, machine or outbuilding.

Tenant suite plumbing

Trenches for new restrooms or a kitchen in a commercial build-out.

Outdoor utility trench

An exterior run through a driveway or yard, with the ground put back after.

How a Kogan Trenching Job Runs

Marked, cut, dug and hauled, then closed after your inspection.

Step 1

Mark the Run

We lay out the trench from your drawing, confirm depth and width and check for known lines in the path.

Step 2

Saw and Break

The slab is cut along both edges with water at the blade, then the strip between is broken out.

Step 3

Dig to Grade

Soil is dug to your depth, kept off the edges and loaded out with the concrete.

Step 4

Backfill After Inspection

Once the pipe is in and passed, the trench is backfilled, ready for the patch.

Trench Safety, Utility Locates and Silica Rules in Arizona

Digging under a slab falls under OSHA excavation rules, and outdoor runs can fall under Arizona Blue Stake law. Here is what each says, linked to the text.

OSHA Excavations

OSHA’s protective systems rule requires cave-in protection for anyone in an excavation unless it is in stable rock or under 5 feet deep with a competent person finding no sign of a cave-in. The general excavation rule also requires a ladder, ramp or stairs in trenches 4 feet or deeper.

Arizona Blue Stake

Under A.R.S. 40-360.22, nobody may begin excavating in a street, right-of-way or utility easement without first finding out where underground facilities are. Operators have two working days to mark, the area must be white-lined first and the marks stay valid for fifteen working days.

Silica Dust

Cutting the slab is covered by the OSHA silica standard, which calls for saws with water continuously fed to the blade and bans dry sweeping where wet cleanup or HEPA vacuums would work.

Trenching quick facts
5 feet

is where OSHA cave-in protection generally starts

2 working days

for utility operators to mark under Blue Stake law

15 working days

is how long Blue Stake marks stay valid

Slab trenching nearby

Job outside these cities? Email the drawing and the site address.

Pricing

What Sets the Cost of Slab Trenching

Trenching is quoted after we walk the run at no charge, and the written price lists length, width, depth and haul-off. These matter most:

Length of the run

A short repair trench and a run across the building are priced very differently.

Depth and width

Deeper or wider trenches mean more digging and more spoil.

Slab thickness and rebar

Thick, reinforced slabs take longer to saw and break.

Inside or outside

Interior runs need containment; outdoor runs need the ground restored.

Spoil volume

Every yard of soil and concrete has to be loaded and hauled.

Backfill and compaction

Closing the trench after inspection is priced into the scope.

Access

Narrow doors, finished rooms and long carries add labor.

Your number, in writing

Send the drawing, we walk the run, and the price comes back in writing.

Timeline

How Long Does Slab Trenching Take?

Length and depth set the pace. Your proposal fixes the dates so the trench is open when the plumber arrives.

Small

One short repair trench

Often cut, dug and hauled in one visit.

Medium

Several runs in one suite

Opened to match the install dates your plumber sets.

Large

A trench network across a building

Run by run, so other trades keep working.

What adds time

Trench Runs on the Job

Two views from one interior trenching job inside an open commercial building.

Trench Network Across the Slab

Open commercial building interior

A compact excavator dug a branching network of trenches between straight saw cuts, with broken concrete piled to one side.

What came out

Long Run Toward the Open Front

Same building, front section

A long trench ran across the floor toward the open front, with soil banked beside it and slab pieces stacked for hauling.

What came out

Who we work with

Slab Trenching for Plumbers, Contractors and Owners

Most of our trenches are dug for another trade, so we work to their drawing and their date.

Plumbers

Under-slab sewer and drain work.

General contractors

Tenant improvements and remodels.

Owners and property managers

Fixing a failed line under the floor.

Several sites need trenches? Phone us to stack the site visits on one day.

Slab Trenching FAQ

What plumbers and owners ask before the saw comes out.

Need a trench opened?

Send the drawing or the length and depth, and we will walk the run and price it.

Yes. You get an open trench, not just a cut line.

Send us the drawing, and we can confirm if that depth is in our range.

Yes, once your pipe is in and inspected.

Under OSHA, trenches 5 feet deep or more generally need a protective system such as sloping, shoring or a trench box, and shallower ones can need it too if a competent person sees a cave-in risk.

Arizona law requires underground facilities to be located before excavating in a street, right-of-way or utility easement. For runs inside a building, we still check for known lines in the path first.

Yes. We contain the work area, control slurry from the saw and keep spoil off the finished floors.

The new concrete over the trench is a separate pour. Our flatwork crew can quote it, or your contractor can handle it.

Related Services and Guides

Trenching usually goes with these jobs.

All our concrete sawing and removal work in one place.

Straight cuts and openings through floors and drives.

New slabs and patches poured over the backfilled trench.

Build-outs that often need new under-slab plumbing.

Penetrations cored where a trench is too much.

Old slabs and footings removed after the cut.

Hauling for spoil, concrete and debris.

What to look for when hiring an excavation crew.

Get a Free Slab Trenching Estimate in Phoenix

Send the drawing or tell us the length and depth of the run. A crew lead visits the run and follows up with a quote on paper.