Home Commercial Construction Tenant Improvements And Build-Outs

Tenant Improvements in Phoenix, AZ

Commercial Build-Outs for Offices, Restaurants and Retail Suites, From the Old Interior Out to the New One In

We tear out the old space and build the new one, so nothing behind the walls is a surprise. Holding AZ ROC CR-61 (carpentry and remodeling) and CR-57 (wrecking) licenses, Kogan LLC is an insured Phoenix builder that handles commercial tenant improvement build-outs: interior framing, demising and partition walls, door openings, ceilings, drywall, finishes and concrete slab work. We do not draw the plans, wire the suite, run plumbing or HVAC, or install fire sprinklers; your architect and licensed trades cover those. For suites in Tempe, Mesa and downtown Phoenix, one schedule and one project manager carry it from strip-out to move-in. Book a free walkthrough.

★★★★★  4.9 on Google

Construction safety certification

#335869 · Wrecking

#346029 · Carpentry and remodeling

Inside a build-out

What a Kogan Tenant Improvement Includes, and What the Licensed Trades Bring

New walls going up on a bare slab. Each numbered pin points to an item in the list beside the photo.

1
2
3
4

New stud walls framed on a concrete slab

1

Interior framingPartition and demising walls laid out to the plan and framed plumb

2

Doors and openingsHeaders, cased openings and door frames set where the floor plan puts them

3

CeilingsCeiling framing, soffits and bulkheads built to hide ducts and mark out rooms

4

Concrete slab workTrench patches, slab repairs and new pours where floors were opened or are uneven

5

Insulation and drywallSound batts in the walls, board hung, taped and finished

6

Finishes and handoverPaint, trim and doors hung, then the suite cleaned for the tenant

Not part of the job

Who handles the rest of the build-out

We frame, finish and pour. Design and the regulated systems belong to the pros licensed for them.

Plans and engineering

Permit drawings, stamped structural details and code analysis come from your architect or engineer.

Electrical, plumbing and HVAC

Wiring, fixtures, gas, ductwork and rooftop units go to licensed trade contractors.

Landlord base building work

Roof, shell, storefront and shared building systems stay with the landlord under your lease.

Part of our commercial construction work. Space still full of the last tenant? Start with tenant improvement demolition, and see how our project management keeps one schedule.

Smaller build-outs

Not a Full Suite? Smaller Build-Out Scopes

Plenty of tenants only need part of a space reworked. We price and schedule just that piece.

Office reconfiguration

A few new offices, a conference room or a wider corridor framed into an existing office floor.

Restaurant back of house

Kitchen floors opened for drains and patched, walls and ceilings redone behind the line.

Retail refresh

Fitting rooms, a stockroom wall or a new cash wrap area built into a store that stays mostly intact.

Slab trenching and patching

Concrete cut for new plumbing under the floor, then poured back level with the slab around it.

How a Kogan Build-Out Runs

Framing, concrete and finishes, on one schedule with one point of contact.

Step 1

One Crew

Tear-out and build-out on one schedule. The crew that strips the suite sees what is behind the walls before a single new stud goes up.

Step 2

Framing

Interior walls, openings and structural work. Layout follows the permitted plans, and anything the drawings missed is raised with your architect.

Step 3

Concrete

Slab repairs and new pours. Floors opened for plumbing are patched flush so flooring can go straight down.

Step 4

Handed Over Clean

Ready to move in. Debris is hauled, the suite is cleaned, and punch items are closed out with you on the final walk.

Commercial Tenant Improvement Permits in Phoenix

A tenant improvement in Phoenix needs a commercial building permit. Here is what the city says, with links to its pages.

Commercial Permit

The City of Phoenix commercial plan review page says a commercial building permit is required for non-residential construction, including remodels, additions, tenant improvements and changes of use. Since April 27, 2026, new commercial plan review and inspection permits go through the city’s SHAPE PHX portal.

Demolition Inside the Permit

When the strip-out is part of the build-out, Phoenix’s demolition permit handout says demolition work included in a separate building permit is covered without a second, separate demo permit. A strip-out with no build-out permit behind it needs a demolition permit before work begins.

Asbestos Before the Strip-Out

Commercial buildings are regulated under the asbestos NESHAP. Maricopa County’s asbestos program wants the building surveyed by an AHERA inspector before any renovation, and when regulated amounts of friable asbestos will be disturbed, the county must get notice 10 or more business days ahead.

Tenant improvement permit quick facts
Required

commercial building permit for tenant improvements in Phoenix

SHAPE PHX

portal for new commercial permits since April 2026

10 days

business days of notice before regulated asbestos work

Tenant improvements nearby

Send the suite address and your floor plan, and we will tell you what the permit path looks like.

Pricing

What Sets the Price of a Tenant Improvement

Build-outs are priced after a free walkthrough against your plans, and the written proposal lists price, scope, schedule and your project manager. These drive the number:

Suite size

A small office suite and a full restaurant space differ in every line of the proposal.

Strip-out first

A suite still holding the last tenant needs demolition before any build-out begins.

Wall count

More offices, restrooms and demising walls mean more framing, board and finishing.

Ceiling type

Drywall ceilings and soffits take longer than a grid ceiling.

Slab work

Trenches for new plumbing and slab patches add saw cutting, pouring and curing.

Working hours

Occupied buildings that require night or weekend work change crew scheduling.

Finish level

Paint grade trim and basic finishes cost less than detailed millwork and feature walls.

Your number, in writing

Tour the suite together one time, and your written proposal follows, priced from your plans.

Timeline

How Long Does a Tenant Improvement Take?

Size, plan review and the other trades set the pace. Your proposal lays out the schedule before work starts.

Small

A few walls or one room

Quick scopes that fit around a business that stays open.

Medium

A full office or retail suite

Strip-out, framing, board and finishes sequenced with the trades.

Large

Restaurant or multi-suite build-out

Phased in the proposal around inspections and equipment deliveries.

What adds time

Recent Build-Out and Interior Framing Work

Interior work our crews have done, from a restaurant kitchen floor in San Tan Valley to new stud walls on bare slab.

Restaurant Kitchen Floor Drain

Restaurant back of house, San Tan Valley

A long stainless trench drain now sits flush in the tiled kitchen floor, running past the walk-in cooler doors with floor tile on both sides.

In the photo

New Wall Framed on a Tile Floor

Interior remodel

A new stud wall with a door opening stands between two rooms, framed on top of the existing tile floor with the drywall still to come.

In the photo

Garage Converted Into Finished Rooms

Garage conversion

Stud walls and a framed opening divide the old garage slab into rooms, with insulation in the exterior walls and ceiling framing overhead.

In the photo

Who we work with

Build-Outs for Business Owners, Landlords and General Contractors

From a tenant fitting out a first location to a landlord readying vacant suites, the strip-out and build-out run as one job.

Business owners and tenants

Opening or moving a location.

Landlords and property managers

Vacant suites ready to lease.

General contractors and developers

You run the project, we carry the interior.

Several suites in one building? Call and we will walk them together.

Tenant Improvement Questions

What Phoenix tenants and landlords ask before a build-out.

Planning a build-out?

Send the suite address and your plans, and we will meet you there and write up the proposal.

Yes. We will look at what was left first.

Yes, for the trades in our scope.

Yes. We can pull and manage them.

Yes. Phoenix calls for a commercial building permit on tenant improvements, remodels, additions and changes of use, and new commercial permits now go through the SHAPE PHX portal.

Demolition strips the old finishes, walls and ceilings out of the suite. The build-out frames, finishes and pours what the new tenant needs. Kogan does both, so one crew sees the space from empty to finished.

Yes. Dust and site access are controlled, and noisy work can be scheduled around the neighboring tenants.

Your architect or designer prepares the permit drawings. We price and build from them, and point out anything on site that does not match.

Related Services and Guides

Build-outs usually involve some of these services.

Interior build-outs and slab work for business spaces.

Old suites stripped to a shell before the build-out.

Slabs, pads and walkways poured on a prepared base.

Only the walls and finishes you name come out.

Contained demo inside occupied office buildings.

Cubicles and fixtures removed before the build-out.

One schedule and one contact for the whole job.

What to ask before you hire for commercial work in Phoenix.

Get a Free Tenant Improvement Estimate in Phoenix

Walk us through the suite and the plans. You get a written proposal with price, scope, schedule and the project manager who will run it.