Home › Commercial Construction › Tenant Improvements And Build-Outs
We tear out the old space and build the new one, so nothing behind the walls is a surprise. Holding AZ ROC CR-61 (carpentry and remodeling) and CR-57 (wrecking) licenses, Kogan LLC is an insured Phoenix builder that handles commercial tenant improvement build-outs: interior framing, demising and partition walls, door openings, ceilings, drywall, finishes and concrete slab work. We do not draw the plans, wire the suite, run plumbing or HVAC, or install fire sprinklers; your architect and licensed trades cover those. For suites in Tempe, Mesa and downtown Phoenix, one schedule and one project manager carry it from strip-out to move-in. Book a free walkthrough.
★★★★★ 4.9 on Google
Construction safety certification
#335869 · Wrecking
#346029 · Carpentry and remodeling
Inside a build-out
New walls going up on a bare slab. Each numbered pin points to an item in the list beside the photo.
New stud walls framed on a concrete slab
Interior framingPartition and demising walls laid out to the plan and framed plumb
Doors and openingsHeaders, cased openings and door frames set where the floor plan puts them
CeilingsCeiling framing, soffits and bulkheads built to hide ducts and mark out rooms
Concrete slab workTrench patches, slab repairs and new pours where floors were opened or are uneven
Insulation and drywallSound batts in the walls, board hung, taped and finished
Finishes and handoverPaint, trim and doors hung, then the suite cleaned for the tenant
Not part of the job
We frame, finish and pour. Design and the regulated systems belong to the pros licensed for them.
Permit drawings, stamped structural details and code analysis come from your architect or engineer.
Wiring, fixtures, gas, ductwork and rooftop units go to licensed trade contractors.
Roof, shell, storefront and shared building systems stay with the landlord under your lease.
Part of our commercial construction work. Space still full of the last tenant? Start with tenant improvement demolition, and see how our project management keeps one schedule.
Smaller build-outs
Plenty of tenants only need part of a space reworked. We price and schedule just that piece.
A few new offices, a conference room or a wider corridor framed into an existing office floor.
Kitchen floors opened for drains and patched, walls and ceilings redone behind the line.
Fitting rooms, a stockroom wall or a new cash wrap area built into a store that stays mostly intact.
Concrete cut for new plumbing under the floor, then poured back level with the slab around it.
Framing, concrete and finishes, on one schedule with one point of contact.
Step 1
Tear-out and build-out on one schedule. The crew that strips the suite sees what is behind the walls before a single new stud goes up.
Step 2
Interior walls, openings and structural work. Layout follows the permitted plans, and anything the drawings missed is raised with your architect.
Step 3
Slab repairs and new pours. Floors opened for plumbing are patched flush so flooring can go straight down.
Step 4
Ready to move in. Debris is hauled, the suite is cleaned, and punch items are closed out with you on the final walk.
A tenant improvement in Phoenix needs a commercial building permit. Here is what the city says, with links to its pages.
The City of Phoenix commercial plan review page says a commercial building permit is required for non-residential construction, including remodels, additions, tenant improvements and changes of use. Since April 27, 2026, new commercial plan review and inspection permits go through the city’s SHAPE PHX portal.
When the strip-out is part of the build-out, Phoenix’s demolition permit handout says demolition work included in a separate building permit is covered without a second, separate demo permit. A strip-out with no build-out permit behind it needs a demolition permit before work begins.
Commercial buildings are regulated under the asbestos NESHAP. Maricopa County’s asbestos program wants the building surveyed by an AHERA inspector before any renovation, and when regulated amounts of friable asbestos will be disturbed, the county must get notice 10 or more business days ahead.
commercial building permit for tenant improvements in Phoenix
portal for new commercial permits since April 2026
business days of notice before regulated asbestos work
Mesa · Phoenix · Chandler · Cave Creek · Tempe · Fountain Hills
Send the suite address and your floor plan, and we will tell you what the permit path looks like.
Pricing
Build-outs are priced after a free walkthrough against your plans, and the written proposal lists price, scope, schedule and your project manager. These drive the number:
A small office suite and a full restaurant space differ in every line of the proposal.
A suite still holding the last tenant needs demolition before any build-out begins.
More offices, restrooms and demising walls mean more framing, board and finishing.
Drywall ceilings and soffits take longer than a grid ceiling.
Trenches for new plumbing and slab patches add saw cutting, pouring and curing.
Occupied buildings that require night or weekend work change crew scheduling.
Paint grade trim and basic finishes cost less than detailed millwork and feature walls.
Tour the suite together one time, and your written proposal follows, priced from your plans.
Timeline
Size, plan review and the other trades set the pace. Your proposal lays out the schedule before work starts.
Small
Quick scopes that fit around a business that stays open.
Medium
Strip-out, framing, board and finishes sequenced with the trades.
Large
Phased in the proposal around inspections and equipment deliveries.
Interior work our crews have done, from a restaurant kitchen floor in San Tan Valley to new stud walls on bare slab.
Restaurant back of house, San Tan Valley
A long stainless trench drain now sits flush in the tiled kitchen floor, running past the walk-in cooler doors with floor tile on both sides.
In the photo
Interior remodel
A new stud wall with a door opening stands between two rooms, framed on top of the existing tile floor with the drywall still to come.
In the photo
Garage conversion
Stud walls and a framed opening divide the old garage slab into rooms, with insulation in the exterior walls and ceiling framing overhead.
In the photo
Who we work with
From a tenant fitting out a first location to a landlord readying vacant suites, the strip-out and build-out run as one job.
Opening or moving a location.
Vacant suites ready to lease.
You run the project, we carry the interior.
Several suites in one building? Call and we will walk them together.
What Phoenix tenants and landlords ask before a build-out.
Send the suite address and your plans, and we will meet you there and write up the proposal.
Yes. We will look at what was left first.
Yes, for the trades in our scope.
Yes. We can pull and manage them.
Yes. Phoenix calls for a commercial building permit on tenant improvements, remodels, additions and changes of use, and new commercial permits now go through the SHAPE PHX portal.
Demolition strips the old finishes, walls and ceilings out of the suite. The build-out frames, finishes and pours what the new tenant needs. Kogan does both, so one crew sees the space from empty to finished.
Yes. Dust and site access are controlled, and noisy work can be scheduled around the neighboring tenants.
Your architect or designer prepares the permit drawings. We price and build from them, and point out anything on site that does not match.
Build-outs usually involve some of these services.
Interior build-outs and slab work for business spaces.
Old suites stripped to a shell before the build-out.
Slabs, pads and walkways poured on a prepared base.
Only the walls and finishes you name come out.
Contained demo inside occupied office buildings.
Cubicles and fixtures removed before the build-out.
One schedule and one contact for the whole job.
What to ask before you hire for commercial work in Phoenix.
Walk us through the suite and the plans. You get a written proposal with price, scope, schedule and the project manager who will run it.