Home › Service Areas › Chandler
Is your office suite on the Price Road corridor due back to the landlord, or does a Chandler Airpark unit need its floor trenched for new power? Chandler property managers and general contractors call Kogan LLC, insured and holding Arizona ROC licenses, for tenant improvement demolition, selective demolition, concrete cutting and equipment removal. We file the city permit, coordinate utility disconnects, arrange asbestos surveys where required and clear out the debris. Walk the suite with us for free and get a written price.
★★★★★ 4.9 on Google
Construction safety certification
#335869 · Wrecking
#346029 · Carpentry and remodeling
Chandler is heavy on office, technology and light industrial space, so most of our work here happens between tenants. Suites get stripped to the shell, floors get trenched for new services and machines come out of shops. Kogan LLC fits that work between two fixed dates.
When a lease ends, Chandler landlords line up our tenant improvement demolition and office demolition crews, and for selective demolition when only part of a floor changes while the rest stays open. Manufacturers along the Airpark bring us in for machine shop demolition. Fresh conduit and drain lines start with slab sawing and trenching, while our debris removal crew keeps the loading dock clear. When the shell is ready, the commercial construction team at Kogan can take the build-out.
Office and suite strip-outs down to the shell, with ceilings, walls and flooring gone so your build-out crew starts on time.
Kitchen, bathroom and tile tear-outs for Chandler homeowners, planned with the same care we bring to commercial suites.
Ceiling grid, carpet, drywall and furniture hauled out of Chandler suites and loading docks, with metal pulled for recycling.
Machinery, racking and equipment taken out of Chandler plants and shops, with the bays that keep running walled off from the work.
Slab trenching, sawing and core drilling for new electrical, data and plumbing, cut precisely so the floor around it survives.
Pools behind Chandler homes broken out and backfilled with compacted soil, ready for turf, pavers or a new design.
A historic storefront downtown, a tech office along the Loop 101 and a machine shop at the Airpark all run on different rules and schedules. This is how Kogan LLC plans around each part of Chandler.
Historic square and new mixed use
Older storefronts around Dr. A.J. Chandler Park sit beside newer restaurants and offices. We strip interiors for new concepts, protect historic facades and coordinate deliveries and debris around busy sidewalks.
Typical jobs
Tech campuses and office parks
Large office and technology buildings along the Loop 101 where suites turn over between tenants. We take out cubicles, ceilings and raised floors on the landlord’s schedule, often after hours.
Typical jobs
Light industrial and flex space
Shops, hangars and flex buildings around Chandler Municipal Airport. We remove machines and racking, trench slabs for new equipment power and wall off the bays that keep running.
Typical jobs
Chandler ZIP codes we serve:
85224
85225
85226
85248
85249
85286
Your handover date does not move because a form is missing. Kogan LLC lines up the city permit, the utility work and the county asbestos steps early, so the demolition fits the window you have.
Chandler reviews and issues its own building permits, which puts demolition under the city, not Maricopa County. We assemble the application and file it so your schedule is not stuck waiting on paperwork. Most demolition needs a permit, and some minor interior work may not. We confirm which applies to your suite during the walkthrough.
In an occupied building, the power, data, sprinkler and plumbing that feed your suite often serve the neighbors too. Kogan LLC works with building engineering and the utilities to isolate only what runs through your suite, so neighboring units keep running.
No commercial strip-out in Chandler proceeds until a surveyor clears it for asbestos, and county air quality officials expect a written filing 10 working days or more before the crew mobilizes. We order the survey early so that waiting period runs alongside the permit instead of after it.
Chandler’s own staff review demolition applications, not county staff
of county notice before a commercial strip-out can begin
Kogan LLC has cleared suites and shops for Arizona owners
Gilbert · Tempe · Mesa · Queen Creek
Suite on the Gilbert or Tempe side of the city limits? Send us the address and we will confirm it fits.
Tenant improvement work lives between two dates you do not control. Here is how Kogan LLC fits the demolition in without moving either one.
Step 1
Have your lease return day and the contractor’s mobilization day handy. We tour the Chandler space, note what the landlord wants left, and check dock access, elevator rules and working hours at no cost.
Step 2
You get a written price with the scope, the after-hours needs and the debris plan, plus a working timeline that counts backward from the day the keys go back.
Step 3
Kogan LLC files the Chandler permit when needed, orders the asbestos survey and county notice early, and isolates the suite’s services together with your building engineer.
Step 4
Crews take out ceilings, walls, flooring or machines, keep the hallways and neighbors clean, recycle metal when the load allows and turn over an empty shell on the agreed date.
Property managers, tenants and general contractors in Chandler usually ask these before a strip-out or slab cut.
Call Kogan LLC with your Chandler suite address and handover date.
The suite’s square footage, what the lease requires you to remove and the number of loads leaving the building set the price. Kogan LLC walks the space at no cost and sends a written price, debris removal included.
Kogan LLC does. Permits for Chandler projects are a city matter, so the county never touches them, and we confirm during the walkthrough whether your scope requires one.
It depends on the suite size, the after-hours limits and the permit, so your timeline is set in the written price. On the residential side, a kitchen typically comes out in a day, one bathroom in one day and a pool over a few days.
Yes. Commercial demolition requires an asbestos survey and written county notice ahead of time. Kogan LLC orders both early so they do not hold up the permit or your handover.
Yes. Our slab sawing and trenching crews cut interior slabs for electrical, data and plumbing runs, keeping the cut tight so surrounding floors stay intact.
Yes. Nights and weekends are normal on tenant improvement work, and most Chandler buildings expect it.
Work without a permit can begin once you approve the written price and the building signs off on access. Permitted jobs start when the city issues the permit, and we plan the date with you on the walkthrough.
Kogan LLC charges nothing to look at the space and write up the price. You are not committed to anything.
Kogan LLC loads it out through the dock or service elevator the building assigns, sort metal for recycling when there is enough, and haul everything else away the same shift it comes down.
Kogan LLC runs crews out of north Phoenix, about 45 minutes from Chandler when the 101 and the 202 are clear. We serve downtown, the Price Road corridor, the Airpark, Ocotillo and west Chandler, and we cover Gilbert, Tempe, Mesa and Queen Creek as well.
Send the suite address, your handover date and the build-out start. We will walk it, plan around both dates and email a written quote ready to forward to the landlord.